Bagged Silverado
#11
I never a huge fan of them but always thought it would be cool to build one, honestly if i had the money i would end up building every type of car/truck i could, some to sell, some to drive and enjoy, just becuase there is so many differnt styles, combinations, era's, i was the kid in school drawing cars making like 6 different pictures of teh same one with different styles, i would go so far as drawing out what seat,sterringwheels, grills, everything looked like instead of doing my schoolwork
i'll get some more pics tonght while i'm there, hoping to get the valves mounted wires ran into the cab and start plumbing(my job for the night) if that goes good maybe start wiring up the controler, and plan a intake, it's amazing how much time things take when you think it will be a quick process
i'll get some more pics tonght while i'm there, hoping to get the valves mounted wires ran into the cab and start plumbing(my job for the night) if that goes good maybe start wiring up the controler, and plan a intake, it's amazing how much time things take when you think it will be a quick process
#12
Got the valves mounted, wireloomed and ran into the cab, bat cables ran, we got some line fitted,
Pumps are wired and operational, only 2 pics I got
Started it tonight first time in IDK how may months, shot a beer can out of the exhaust lol,
Pumps are wired and operational, only 2 pics I got
Started it tonight first time in IDK how may months, shot a beer can out of the exhaust lol,
Last edited by Budsjlm; 08-24-2012 at 12:09 AM.
#14
Tuesday did a fair amoun of work, ran the wires for the vavles and what not under the carpet, started plumbing,
got 2 of the 5 guage line ran (tank guage and rear pass)
got the rear bags plumbed and the supply lines ran
fuzzy pic but it works
Mike put me incharge of the plumbing, wiring and anyting in the interior, i have to run 2 power wires and the wiring is done
he said he's full confident in my ability and how i want to run thing is how he would. even tho he said just do. it it's his truck so i am consulting him on anything that i want to make sure is done correctly or if i have a slighly different idea than what was first planned, it's comming along nicly imho, a few more weeks and i think it will be done,
got 2 of the 5 guage line ran (tank guage and rear pass)
got the rear bags plumbed and the supply lines ran
fuzzy pic but it works
Mike put me incharge of the plumbing, wiring and anyting in the interior, i have to run 2 power wires and the wiring is done
he said he's full confident in my ability and how i want to run thing is how he would. even tho he said just do. it it's his truck so i am consulting him on anything that i want to make sure is done correctly or if i have a slighly different idea than what was first planned, it's comming along nicly imho, a few more weeks and i think it will be done,
#15
switched power and valve control 100% wired up and opperational just needs a little cleaning up , got the new u joint in, driveshaft in, front bags plumbed, just needs alittle clean up and fitment finish, we just looped the guage ports so we could air it up and see it in action, we have to adjust the watts link aswell
Bags empty it sitting on it's own
Frame doesn't quiet lay out yet but we need to clearance more in the front, it is currantly sitting on the firewall,
Video of mike playing with the switches
<EMBED height=361 type=application/x-shockwave-flash width=600 src=http://static.photobucket.com/player.swf flashvars="file=http%3A%2F%2Fvid139.photobucket.co m%2Falbums%2Fq283%2Fbudsmadison%2FVIDEO0022-1.mp4" wmode="transparent" allowNetworking="all" allowFullscreen="true">
idk why but embedment doesn't wanna work for me so here is a clickiable one to see it
Bags empty it sitting on it's own
Frame doesn't quiet lay out yet but we need to clearance more in the front, it is currantly sitting on the firewall,
Video of mike playing with the switches
<EMBED height=361 type=application/x-shockwave-flash width=600 src=http://static.photobucket.com/player.swf flashvars="file=http%3A%2F%2Fvid139.photobucket.co m%2Falbums%2Fq283%2Fbudsmadison%2FVIDEO0022-1.mp4" wmode="transparent" allowNetworking="all" allowFullscreen="true">
idk why but embedment doesn't wanna work for me so here is a clickiable one to see it
Last edited by Budsjlm; 09-05-2012 at 11:58 AM.
#18
Going to go work on it tonight, might have to spend a hour or so up at the parts store figuring out the soft line length so we have enough travel for when we travel the rearend, then get some fluid in the lines and bleed the crap out them, and add Trany fluid, and it's driviable, I'm hoping he has located the airlines and fittings for the gauges so we can get them hooked up, then gatta do clean up on wiring just zipties and loom and whatnot
#19
Gauges all plumbed, wired ect, we deleted the scale, and started checking for leak... Got a lot to tighten, re teflon ect, didn't get a ton done tonight but it's progress!
Independent bag contol is complete
Leaks!
Evap GONE!
Gauges wire and plumbed!
Independent bag contol is complete
Leaks!
Evap GONE!
Gauges wire and plumbed!
Last edited by Budsjlm; 09-07-2012 at 01:13 AM.
#20