Teacher Todd's House project
#94
there is. It is on every wall. It is done by hand. If you look back at the pictures before I painted you can really see it.
#97
Well I finished all of the major painting tonight. I still need to paint the base moulding tomorrow and touch up a couple of minor spots around the wall heaters. I also need to paint the bathroom door and front door. That may wait until a nice warm spring day. We got the outside lights up the other day so I can see going in and out at night.
Here are a couple of updates. The vinyl will be installed friday.
I finished the second coat on the tan wall and repainted the ceiling to wall transition as I did not like how it came out the first time.
The bathroom door needs to be installed.
Something is missing
Oh there it is.
The underlayment for the vinyl. It is filled and sanded plywood so that the vinyl looks nice and smooth.
Need to start plumbing.
Here are a couple of updates. The vinyl will be installed friday.
I finished the second coat on the tan wall and repainted the ceiling to wall transition as I did not like how it came out the first time.
The bathroom door needs to be installed.
Something is missing
Oh there it is.
The underlayment for the vinyl. It is filled and sanded plywood so that the vinyl looks nice and smooth.
Need to start plumbing.
#100
Hard work does pay `off...Giving `Up to Get it `Done
Look'in `Great 4-Sure
Teacher, take a break & listen to a tune & EnJoy
Music 4 your new `Crib
Mötley Crüe - Home Sweet Home
http://www.youtube.com/watch?v=hBiETZFOrFc