7th Gen ('06-'07): check list almost complete
#1
check list almost complete
It has taken me some time to do because having to pay for other things first. Like house car insurance for both also others that go with them.
things I have done on the list is
1. strut tower braces
2. shifter ***
3. tint
4. different trans pan that has a drain plug and fins.
5. new electrical harness that has fog light wires and fog light install
6. cold air intake which is black from cold air inductions.
Things that are going to take some time.
1. led tail lights
2. projector head lights
3. different rims
4. redo the interior to leather and padding.
5. get a different steering wheel because the one I have is peeling
I don't know what size I have to replace it with a better type that the lz1 has I think it is the same size but I don't know
6. making a true dual exaughst instead of the single that I have right now
things I have done on the list is
1. strut tower braces
2. shifter ***
3. tint
4. different trans pan that has a drain plug and fins.
5. new electrical harness that has fog light wires and fog light install
6. cold air intake which is black from cold air inductions.
Things that are going to take some time.
1. led tail lights
2. projector head lights
3. different rims
4. redo the interior to leather and padding.
5. get a different steering wheel because the one I have is peeling
I don't know what size I have to replace it with a better type that the lz1 has I think it is the same size but I don't know
6. making a true dual exaughst instead of the single that I have right now
Last edited by monte07; 10-18-2013 at 01:02 PM. Reason: miss spellings
Thread
Thread Starter
Forum
Replies
Last Post
Sales @ CAI Inc
Off Topic
4
10-05-2012 08:49 AM
blackmonte781
General Monte Carlo Talk
11
04-30-2012 11:48 AM